    In April 2017, JV LLC “Toshkent Metallurgiya Zavodi” was initiated with the participation of the Reconstruction and Development Fund of the Republic of Uzbekistan and foreign investors to implement the investment project “Construction of the Tashkent Metallurgical Plant”. The factory has become one of the largest and most modern industrial enterprises in Uzbekistan.

The main goal was to provide the local market with high quality steel production enabled to compete with steel manufacturers worldwide. In addition, such an import substitution allows local manufacturers in construction industry and other fields to reduce the costs and prices significantly.

THE GOAL

OF COMPANY

To provide steel products consumer market with high quality import-substituting products, able to compete with manufacturers from near and far abroad countries. Therefore, this provision will allow domestic producers of construction, industrial and other industries to significantly reduce their costs and prices.

16_wire-rod-512
0
coils are produced
102849
0
tons of rolled steel
0
employees
0
awards

CONSTRUCTION

CONSTRUCTION AREA 

REINFORCED CONCRETE STRUCTURES

STEEL STRUCTURES, INCLUDING TECHNOLOGICAL 

BASIC TECHNOLOGICAL EQUIPMENT

CONSTRUCTION WORKS HAVE BEEN COMPLETED 

COMPLETED

46.1 ha

90 ths.m3 

17 ths. tons

4.8 ths. tons

90 thousand m2

36 sub-facilities

EXTERNAL UTILITY INFRASTRUCTURE

EXTERNAL POWER SUPPLY

220 kV overhead power line with a total length of 46 km was constructed, as well as the Sergeli 220/110/10 kV and the Metallzavod 110/10 kV substations supplied the TMP with power.

CONSTRUCTION OF A RAILWAY LINE

5.6 km of railway tracks with adjacency to the internal railways of TMP was constructed

CLOSED HORIZONTAL DRAINAGE SYSTEM CONSTRUCTION

Closed horizontal drainage structure of 2.55 km long with the outlet into the open Sergeli collector was constructed

FIRE STATION FOR TMP MAINTENANCE

Fire station for fire safety of TMP was built.

CONSTRUCTION OF ACCESS ROADS

Two access roads of 200 linear meters was constructed.

 

EXTERNAL GAS SUPPLY

The construction of the external route of the gas pipeline with a length of 9.2 km was completed, gas was supplied to gas distribution points and to the gas-consuming process equipment of the plant